2. Dig it- Preparing the trench footer so that they have smooth sides and base
3. Pour it- The concrete of 2500 PSI minimum will be poured level into the trench footer
4. Scrape it- Scraping off any excess dirt from the crawl space to ensure proper drainage should water ever infiltrate that area.
5. Pin it- Concrete nails mark all the outside and inside corners of your foundation to accurate depict the outline of your home.
6. Lay it- Block will be installed on top of footer within the pinned area.